Preventive Maintenance Schedules: Planning Service by Date, Running Hours or Meter Reading

A preventive maintenance schedule sets when each asset is serviced, using one of three triggers: a calendar date (every month or quarter), running hours (every 250 or 500 hours), or a meter reading (every 10,000 km). Choose the trigger that matches how the asset wears out, attach a task list to each service, and generate work orders automatically when the trigger is reached.

Technician in a hard hat beside industrial machinery

Frequently asked questions

What is the difference between preventive and corrective maintenance?

Preventive maintenance is planned work done before a failure, on a schedule. Corrective maintenance is repair work done after something breaks. A good schedule shifts most labour hours from corrective to preventive.

Should preventive maintenance be based on time or usage?

Use usage, such as running hours or kilometres, for assets that wear when they run. Use time for assets that age whether used or not, and combine both with "whichever comes first" for engines and vehicles.

How often should a preventive maintenance schedule be reviewed?

Quarterly is a good default. Compare breakdowns and findings against the schedule, and shorten intervals where failures happen between services.

What is a good PM compliance rate?

Many maintenance teams aim for 90% or more of preventive work orders completed on time. Lower rates usually point to a shortage of technicians, parts or access to the equipment.